Wellcome to National Portal
মেনু নির্বাচন করুন
Main Comtent Skiped

Title
Roads and Highways Department met local representatives and dignitaries.
Details

The present government has initiated various initiatives for faster communication between Chittagong and Cox's Bazar. Among them, Cox's Bazar railway is one of Dohazari. However, today a meeting with the local Union Parishad and the prominent persons in the area by R&H Mr. Masum Mujib, Additional Chief Engineer of Roads and Highways Department, said that with the help of Cox's Bazar, all the Bangladeshi nationals will be able to build a 4-lane road for quick communication. He said that the construction of the 4-lane road will change the migration of the population. The government will work to acquire land after feasibility and design. After seeing the draft design, Cox's Bazar-Khurushchal Taitia and Choupal Dandy Bridge were found. From the Chauvaldandi bridge to the south, the pokhakhali will pass through the pokhkhali naikhangdia. In this way Badarkhali Imani will reach the name of the 4 lane road. Present on the occasion were Chairman Waz Karim Babul, UP member Uchching Rakhine, SM Ruhul Alam Danu, UP Secretary Milathoin Rakhine, prominent persons Faridul Alam, Ayub Ali Member, Rafiqul Islam, Anwar Kamal Bhulu, Shafiul Alam, Additional Head of Roads and Highways Department Mr. Masum Mujib, Mr. R&H Mr. CO Kamrul Ahsan were also present.

Images
Attachments
Publish Date
27/06/2018
Archieve Date
31/07/2018